[Road of SKYSQUARE-034-] Moving towards realization! 11th qualification ~Handling~
We had been proceeding with plans anticipating the arrival of electricity and the subsequent implementation of various electrical installations. However, since there were installations that could not be performed solely with an electrician's license, we will now pursue obtaining a new qualification.
Oct 14, 2025


[Road of SKYSQUARE-033-] Start DIYing your booth!! ~Floor~
In my last blog post, we finally got electricity connected to the building.
With electricity now available, we can use outlets, which means we can install PCs, interfaces, and other equipment, as well as set up a refrigerator and microwave.
To install these, we'll start DIY work on the floor.
Oct 3, 2025
![[Road of SKYSQUARE-032-] Infrastructure electricity opened!! ~Electricity~](https://static.wixstatic.com/media/fc32ca_c8a21dadce544d45ac5efbc8cb74a7bd~mv2.jpg/v1/fill/w_333,h_250,fp_0.50_0.50,q_30,blur_30,enc_avif,quality_auto/fc32ca_c8a21dadce544d45ac5efbc8cb74a7bd~mv2.webp)
![[Road of SKYSQUARE-032-] Infrastructure electricity opened!! ~Electricity~](https://static.wixstatic.com/media/fc32ca_c8a21dadce544d45ac5efbc8cb74a7bd~mv2.jpg/v1/fill/w_514,h_386,fp_0.50_0.50,q_90,enc_avif,quality_auto/fc32ca_c8a21dadce544d45ac5efbc8cb74a7bd~mv2.webp)
[Road of SKYSQUARE-032-] Infrastructure electricity opened!! ~Electricity~
I finally managed to set up the building that will become the studio. Next, I'll be working on getting the infrastructure in place.
First, once we have electricity available, we'll be able to power the equipment needed for the recording booth.
Sep 19, 2025
![[Road of SKYSQUARE-031-] Studio Setup!! ~The Room~](https://static.wixstatic.com/media/fc32ca_332c03640b444eebac920bda9e05ed16~mv2.jpg/v1/fill/w_333,h_250,fp_0.50_0.50,q_30,blur_30,enc_avif,quality_auto/fc32ca_332c03640b444eebac920bda9e05ed16~mv2.webp)
![[Road of SKYSQUARE-031-] Studio Setup!! ~The Room~](https://static.wixstatic.com/media/fc32ca_332c03640b444eebac920bda9e05ed16~mv2.jpg/v1/fill/w_514,h_386,fp_0.50_0.50,q_90,enc_avif,quality_auto/fc32ca_332c03640b444eebac920bda9e05ed16~mv2.webp)
[Road of SKYSQUARE-031-] Studio Setup!! ~The Room~
In previous blog post, I wrote about how we finally managed to compact the ground enough to be able to erect a building.
Now, we are finally ready to erect a building that will serve as our studio on this compacted land.
Aug 25, 2025
![[Road of SKYSQUARE-030-] Soil Improvement!! ~Ground~](https://static.wixstatic.com/media/fc32ca_4f02efec1ba343db853b72783e10eb61~mv2.jpg/v1/fill/w_333,h_250,fp_0.50_0.50,q_30,blur_30,enc_avif,quality_auto/fc32ca_4f02efec1ba343db853b72783e10eb61~mv2.webp)
![[Road of SKYSQUARE-030-] Soil Improvement!! ~Ground~](https://static.wixstatic.com/media/fc32ca_4f02efec1ba343db853b72783e10eb61~mv2.jpg/v1/fill/w_514,h_386,fp_0.50_0.50,q_90,enc_avif,quality_auto/fc32ca_4f02efec1ba343db853b72783e10eb61~mv2.webp)
[Road of SKYSQUARE-030-] Soil Improvement!! ~Ground~
We are improving the ground in areas where the land becomes completely muddy when it rains, causing muddy conditions.
The ground ourselves in preparation for the arrival of the container houses.
Aug 22, 2025