top of page


[Algazodik Performance Information] 9/26 [Re:Load] at Suree
Re:Load, a drum ‘n’ bass party delivering multifaceted drum ‘n’ bass sounds, will be held at Suree Ebisu starting at 11:00 PM on Friday, September 26.
Sep 26
![[REAPDOCK-Lua-] -048- [Wwise] Creating object configurations from templates](https://static.wixstatic.com/media/df9c1c_03f82f2a2d4149c2aa39ec4ebdce1511~mv2.webp)
![[REAPDOCK-Lua-] -048- [Wwise] Creating object configurations from templates](https://static.wixstatic.com/media/df9c1c_03f82f2a2d4149c2aa39ec4ebdce1511~mv2.webp)
[REAPDOCK-Lua-] -048- [Wwise] Creating object configurations from templates
This time, we'll introduce a script that uses the API added in GOLD 1.4.0 for copying Wwise objects.
Sep 24
![[Road of SKYSQUARE-032-] Infrastructure electricity opened!! ~Electricity~](https://static.wixstatic.com/media/fc32ca_c8a21dadce544d45ac5efbc8cb74a7bd~mv2.jpg/v1/fill/w_442,h_250,fp_0.50_0.50,q_30,blur_30,enc_avif,quality_auto/fc32ca_c8a21dadce544d45ac5efbc8cb74a7bd~mv2.webp)
![[Road of SKYSQUARE-032-] Infrastructure electricity opened!! ~Electricity~](https://static.wixstatic.com/media/fc32ca_c8a21dadce544d45ac5efbc8cb74a7bd~mv2.jpg/v1/fill/w_315,h_178,fp_0.50_0.50,q_90,enc_avif,quality_auto/fc32ca_c8a21dadce544d45ac5efbc8cb74a7bd~mv2.webp)
[Road of SKYSQUARE-032-] Infrastructure electricity opened!! ~Electricity~
I finally managed to set up the building that will become the studio. Next, I'll be working on getting the infrastructure in place.
First, once we have electricity available, we'll be able to power the equipment needed for the recording booth.
Sep 19
bottom of page